Four people, one upstairs bathroom, and a side door where hockey bags, backpacks and boots all land at once. Plenty of Leaside houses date from the 1930s and 1940s, when daily life asked less of a floor plan.
A home renovation in Leaside, Toronto, should start with your mornings and evenings, then plan the layout, finishes and construction around them.

Four people, one upstairs bathroom, and a side door where hockey bags, backpacks and boots all land at once. Plenty of Leaside houses date from the 1930s and 1940s, when daily life asked less of a floor plan.
A home renovation in Leaside, Toronto, should start with your mornings and evenings, then plan the layout, finishes and construction around them.
Home renovations in Leaside often begin with one room and end up involving three. A kitchen update raises questions about the dining room wall. A second bathroom depends on where the plumbing stack runs. A finished basement only works once the stairs, ceiling height and moisture are sorted out.
We handle design and construction as one team, so we can map those connections at the drawing stage instead of meeting them halfway through the build. Each service below is planned as part of the whole house, not as a standalone job.
In many houses of this era, the kitchen sits at the back with limited counter space and a long walk between the fridge and sink. For a kitchen renovation in Leaside, we plan cabinetry, appliances, storage and work areas around the existing footprint first. Then we show you what moving a wall or window would add before you commit.
A deep closet under the stairs, a narrow wall beside the fireplace, an entry with nowhere for boots: awkward spots like these are where fitted storage earns its place. We design cabinetry, built-ins, benches and trim to the actual dimensions of your rooms, coordinated with the rest of your whole-home renovation.
Each condo building sets its own rules on work hours, elevator bookings, noise and approvals. For condo renovations, we plan layout and finish improvements within your building’s requirements and coordinate with management before work begins.
Basements in older houses often come with low ceilings, small windows and a furnace in the middle of the floor. We assess height, moisture and layout first. Then we design a finished basement around how you’ll use it: a family room, a home office, a gym or a space for guests.
A secondary suite can create separate living space for a relative or another household, but not every basement can become one. Ceiling height, exits, fire separation and other requirements have to be assessed first. If your basement qualifies, we design and build the legal basement apartment and coordinate the approvals it needs.
One shared upstairs bathroom is a familiar frustration in houses of this age. A bathroom renovation in Leaside might mean rebuilding that room with a more practical fixture layout and real storage, or finding space for an ensuite or powder room. Waterproofing, plumbing, tile and fixtures are coordinated as one scope.
Sometimes a renovation can’t give your household what it needs without fighting the existing structure at every step. If you’re weighing a new house on your lot, our custom home design and build service is a separate path. It covers design, approvals and new construction from the ground up.
Some properties may have room for a separate dwelling at the back of the lot. That depends on lot size, access and city requirements. We assess eligibility first and, where a project is permitted, design and build a laneway home or garden suite for family, guests or a home office.
1
1. Project Planning
We start at your house, not our office. We measure and document the existing layout and check the wiring, plumbing and structure where we can. We also talk through what frustrates you and what you’d like to change. Together we agree on priorities and a proposed scope, so your Leaside home renovation is designed from facts about the house and your household.
2
2. Design Development
Next, we turn that scope into layouts, construction drawings and 3D renderings you can react to. You choose cabinetry, tile, fixtures and finishes with our team, and we confirm which approvals apply. Some projects need building permits and some don’t, so we identify requirements early and plan the schedule around them.
3
3. Construction
With approvals in place, we coordinate the trades and sequence the approved work. Weekly site visits keep the work checked against the drawings, and you get regular updates on progress. Renovation still brings noise, dust and some disruption, so we agree on protection and access before starting. We finish with a walkthrough to review the completed work together.
It can work, depending on what’s being opened up. If you’ll still have a working bathroom, heat, water and safe access to the bedrooms, staying may be practical. If the work cuts through your only bathroom, or the kitchen and main floor at the same time, a short move or a phased schedule may be easier on everyone. We settle those arrangements with you before construction starts.
You can, and for some households it’s the right call. The catch is that kitchens, bathrooms and basements often share plumbing runs and walls. Separate projects may mean reopening finished work, or repeating setup and cleanup. Phasing isn’t automatically cheaper. If you do plan in stages, we design the full picture first so each phase leaves room for the next.
Bring whatever’s easy to gather: a survey or old drawings if you have them, phone photos of each room, a list of what bothers you most, a few images you like and the budget range you’re working with. None of it is required. We take our own measurements during planning.
New decisions sometimes come up once walls are open, or you may simply change your mind about a finish. Either way, we write up the proposed change and explain how it affects scope, cost and schedule. Work on the change goes ahead only after you sign off.
It’s worth a call before work starts. Tell your insurer what the renovation includes and whether you’ll live in the house during construction, then ask whether your policy needs any changes for that period. Insurers handle this differently, so get their answer in writing if you can.
We will be happy to discuss your project and make your dreams come true.